Tabas Coal Preparation Plant
Projects
Project / project name: | Tabas Coal Preparation Plant |
Factory / Project Capacity: | 550 thousand tons |
Geolocation of the project location: | South Khorasan province, 100 km south-east of Tabas city, Parvah coal mine, opposite East Pars |
Start date of the project: | 2 January 2015 |
Employment rate: | 80 |
Specifications of raw materials required: | Peaks coal production for a capacity of 505 thousand tons |