Tabas Coal Preparation Plant

Projects

Project / project name: Tabas Coal Preparation Plant
Factory / Project Capacity: 550 thousand tons
Geolocation of the project location: South Khorasan province, 100 km south-east of Tabas city, Parvah coal mine, opposite East Pars
Start date of the project: 2 January 2015
Employment rate: 80
Specifications of raw materials required: Peaks coal production for a capacity of 505 thousand tons